|
Epoxy floor |
Wear-resistant floor |
Terrazzo |
KAIDA seal curing agent |
Performance |
Dustproof effect |
Dust free |
Reduce dust free |
Reduce dust free |
Dust free |
Wear resistance |
2.3 |
4.6 |
3.3 |
6.2 |
Moh's hardness |
2-3 |
6-7 |
4 |
8-10 |
Anti-infiltration |
0Ml/H |
200Ml/H |
250Ml/H |
0.055Ml/H |
Anti-aging |
3-5years |
5-8years |
5-8years |
More than 50 years |
Warranty |
1year |
3years |
3years |
At least 20 years |
Construction features |
Construction method |
Multiple layers multiple times |
Throwing machine |
Water mill |
Spray or roll |
Duration |
After the new floor is dried for 28 days, the construction is about 500M2 per day. |
Simultaneously with concrete pouring, about 1000M2 per day |
Long construction period, 30 days per 3000m2 |
After maintenance with concrete |
About 2000M2 per day |
Maintenance period |
One week |
14 days |
3 days |
3 hours after construction is completed |
7 days can carry |
safety |
Slightly toxic and irritating, construction requires fire protection |
More dust, |
Too many pollutants in construction, not environmentally friendly |
Comply with all VOC rules |
Environmental protection |
Not environmentally friendly |
Construction personnel need to do protection |
Non-toxic, non-combustible, environmentally friendly |
basic requirements |
|
Can only be used on new ground |
no request |
Both new and old floors are available |
Otherwise easy to shell |
Old ground cannot be used |
No waterproof requirements |
Operation and Maintenance |
Clean |
Oil stains and black scratches are not easy to clean |
Oily and easy to seep |
Oily and easy to seep |
Not easy to seep and easy to clean |
Difficult to clean |
Difficult to clean |
Maintenance and |
Easy to shell, easy to leave black scratches, more and more old |
Maintenance trouble |
More dust is used |
Hard to wear, not shell, |
Vulnerability |
Easy to leave black scratches |
Easy to break at the spacer |
The longer the use time, the brighter it is. |
replace |
2-3 years (cheap material 1-2 years) repaint once |
3-5 years of heavy construction |
Replaced in about 10 years |
Semi-permanent, |
cost |
Same cycle as building |
Maintenance and |
Need to be waxed |
Need to be waxed |
Need to be waxed |
Never need to wax, |
Maintenance costs |
2 RMB / M2 each times |
2 RMB / M2 each times |
2 RMB / M2 each times |
Just need to wash water or wash with soapy water |